June 30, 2026

Increase in mineral production of more than 65%
Necessary:
- Increased exploitation on the surface and in depth.
- Modification of the treatment plant.
- Increase in waste dumps.
- Dam regrowth.
The work to be done is:
- Exploitation project with its corresponding annexes.
- Restoration plan in accordance with 975.
- Environmental impact study
- Technical project according to the contents of Annex V of Decree 356/2010.
The preparation will be based on the information collected in the NI43-10 as well as documents such as the geotechnical study, the dam's growth project, expansion designs and the available environmental information that will allow establishing the baseline.